MACUGNAGA SIGNALS TOURISM COMEBACK AS BELVEDERE CHAIRLIFT NEARS SUMMER REOPENING
In this story
Macugnaga
Resort in Piedmont, Italy
- Village height
- 1,317 m
- Top lift
- 2,877 m
- Pistes
- 10 km
- Lifts
- 5
- Nearest airport
- Milan Malpensa International Airport (MXP) · 1h 44m
After months of paralyzing economic uncertainty, a definitive solution is finally in sight for the historic Belvedere chairlift. The newly elected mayor of Macugnaga, Stefano Candiani, has rekindled community optimism by announcing that the vital alpine lift could resume operations within the next few weeks, targeting a grand reopening by July.
The breakthrough announcement was made during the new administration's inaugural City Council meeting, bringing an end to a long-running bureaucratic saga that has kept residents, mountaineers, and local tour operators in the Ossola region in suspense for most of the year.
A Critical Alpine Gateway
The chairlift, which connects Pecetto to Belvedere, is far more than a simple transit line; it serves as the primary tourism artery at the foot of the legendary east face of Monte Rosa.
During the peak summer season, thousands of hikers and mountaineers rely on the lift to quickly ascend to 1,900 meters. From there, they gain direct access to the Belvedere glacier area, the Alpe Pedriola, the heavily visited Zamboni-Zappa refuge, and a vast network of alpine nature trails. The extended closure of the line had threatened to severely disrupt the entire Anzasca Valley's summer tourism economy.
High-Level Negotiations Clear the Path
According to Mayor Candiani, cross-agency discussions between the municipality, the Piedmont Region, technical specialists, and the National Agency for the Safety of Railways, Road and Motorway Infrastructure (ANSFISA) have intensified dramatically over the last few weeks. This collaborative push yielded a technical and administrative framework capable of safely returning the lift to service.
Piedmont Regional Councilor Alberto Preioni confirmed that a fundamental agreement with the regional government is firmly in place, noting that final formal approval hinges on defining a few remaining structural guarantees.
The political pressure to resolve the issue has been mounting since January, when a delegation from Macugnaga met directly with Piedmont Region President Alberto Cirio. Local leaders successfully argued for immediate short-term solutions to reopen the existing lift while simultaneously initiating long-term planning for a modern, next-generation replacement facility to secure the resort’s future.
A Historic Structure with Future Promise
The current chairlift system is divided into two distinct sections—Pecetto-Burki and Burki-Belvedere. The historic infrastructure dates back to a major 1979 reconstruction effort, which was launched after a catastrophic flooding event at Lake Locce destroyed the previous lifts. For nearly five decades, the current system has anchored the modern tourism development of this traditional Walser alpine village.
As Macugnaga navigates the broader, complex challenges facing modern alpine lift management and climate-driven tourism shifts, restoring the Belvedere line is viewed as a monumental strategic win. If the July timeline holds, the town will successfully reclaim its position as a premiere basecamp for exploring the eastern Alps just as the summer vacation season hits its stride.