Beech Mountain Resort To Install Two New Chairlifts. Decrease Travel Time, Increase Capacity And Riding Comfort
05/April/2018
Beech Mountain Ski Resort announces the replacement of two of its main chairlifts, to be ready for the 2018/2019 winter season.Lift 5, which ascends to the 5,506-foot summit, and was originally built in 1987, is currently being disassembled in preparation for the installment of a new Doppelymayr fixed-grip quad lift. The Doppelmayr quad lift will include the addition of a loading conveyor to ensure safe boarding, higher travel speeds and shorter trip times. Lift 5 will now offer 144 chairs with a 6-1/2-minute travel time accommodating 2,400 people per hour.
Lift 6, currently a double chair lift, also ascends to the 5,506-foot summit and will be replaced with an identical Doppelmayr fixed-grip quad lift. This new Doppelmayr quad lift will feature 106 chairs offering a 6-1/2-minute travel time with a capacity of 2,000 people per hour.
Both Doppelmayr quad lifts will feature foot support with upholstered seating and a back rest. Patrons can now expect to reach the 5,506-foot summit with easy on-and-off loading, comfortable seating, and a more efficient layout to eliminate lift-line congestion.
Specs and details:
Lift 5
- Doppelmayr Fixed-Grip Quad
- Loading Conveyor
- 144 Chairs
- 6 1/2-minute trip time
- Upholstered seating and back support
- Foot rest
- 2,400 people per hour
Lift 6
- Doppelmayr Fixed-Grip Quad
- 106 Chairs
- 6 1/2-minute trip time
- Upholstered seating and back support
- Foot rest
- 2,000 people per hour
Total Capacity= 4,400 people per hour