Independent voices. A mountain perspective. The winter edition26 / 27

Find your mountain story.

Resort business and investment Industry News

Schweitzer Contracts Installation Of Two New Lifts For 2019/20

Schweitzer Contracts Installation Of Two New Lifts For 2019/20

In this story

Partners mentioned

Schweitzer

Resort in Idaho, United States

Village height
1,616 m
Top lift
1,949 m
Pistes
74 km
Lifts
10
Nearest airport
Spokane International Airport (GEG) · 2h 14m
Schweitzer guide
As anticipated, Schweitzer Mountain Resort has signed contracts for the installation of two new chairlifts during the summer of 2019 to replace the current Snow Ghost double chair. “After careful review of bids and plans from several manufacturers, we are moving forward with Leitner Poma for a high-speed detachable quad and with Skytrac for a fixed grip triple chair in the Outback Bowl,” stated Tom Chasse, CEO of Schweitzer Mountain Resort. “Overall, we expect the two chair arrangement to complement our existing lift system and provide better access to some of the most popular terrain at Schweitzer.”
The detachable quad chair will offer a capacity of 2400 people per hour and rise 1447 feet in just over 5 minutes. The triple chair capacity is 1800 people per hour and will rise 1360 feet in 8 minutes. “We’ve seen over the years how a similar two lift system in the South Bowl has been beneficial when we have weather challenges,” said Chasse. “By having the two lifts serving different aspects of the North Bowl, our hope is to combat similar challenges on the backside of the mountain. Splitting the lifts also provides a better, safer experience for differing ability levels.” The lower high-speed quad chairlift will start near Cedar Park and unload at the current Snow Ghost midway station while the upper fixed grip triple will provide summit access from a location near Will’s Runout and Vagabond.
During the lift construction process, the resort will also add an additional 4 new runs and increased gladed terrain. “We are looking to create new runs near the Snow Ghost and Have Fun areas that will provide some excellent north facing slopes,” added Chasse. At this point, Schweitzer has not determined names for the new runs or the new lifts. Schweitzer began initial clearing of these areas and secured power to the future lift sites this past summer.
Follow the story
What's next for Schweitzer?

Get Schweitzer news by email.

Follow Schweitzer

Directory

Indy Pass Recco Leitner Zeal Tirol Halti ISPO Technoalpin