Independent voices. A mountain perspective. The winter edition26 / 27

Find your mountain story.

Snow News

Reinswald gets a New cable car for 2027

Reinswald gets a New cable car for 2027

In this story

Austria

Country

Explore Austria

The existing cable car in Reinswald has long served as the economic and recreational heart of the Sarntal valley, but the system has reached a crucial turning point. Operating at its technical and economic limits, the aging lift infrastructure is set to undergo a comprehensive transformation to secure the region’s alpine tourism for future generations.

To replace the legacy lift, local authorities and lift operators have greenlit a major overhaul anchored by a new high-capacity 10-person gondola lift running between Reinswald and Pichlberg. Representing a total investment of €16 million, the project aims to modernize transport, enhance passenger comfort, and bolster year-round economic activity throughout the valley.

Follow the story
What's next for Austria?

Get Austria news by email.

Follow Austria

Project Timeline & Key Infrastructure Upgrades

Construction is scheduled to begin in April 2027, with completion targeted for November 2027 ahead of the winter season.

Some key facts about the construction of the new cable car

  • Construction period: April 2027 – November 2027.

  • Closure: Closed only during the summer of 2027; an exciting alternative program will be offered.

  • Main building: The main buildings at the mountain and valley stations will be renovated.

  • New line: A new gondola lift line will be built between Reinswald and Pichlberg.

  • Mountain and valley stations: A new mountain and valley station will ensure level boarding.

  • Increased capacity: The new 10-person gondola lift will increase capacity.

  • Construction costs: €16 million

While the resort will close its cable car operations for the summer 2027 season to facilitate construction, organizers plan to roll out an exciting alternative summer program to keep visitors engaged. The project encompasses renovating the primary structures at both the valley and mountain terminals, integrating barrier-free level boarding, and introducing state-of-the-art 10-passenger cabins to significantly increase transport capacity.

Leadership Perspectives

Local leadership emphasizes that the modernization extends far beyond upgraded hardgoods, viewing the €16 million undertaking as a catalyst for regional stability and economic growth.

"The construction of the new gondola lift is a future-oriented project for the entire Sarntal valley. Now it’s about taking responsibility together and sending a strong message. This project secures jobs, strengthens tourism and economic activity, and creates a sustainable future for generations to come. I invite everyone to actively participate in this endeavor."

— Julian Lukas Thaler, Acting President of the Reinswald Mountain Lifts

Former leadership echoed the critical timing of the upgrade, pointing to long-term planning across the ski area's footprint.

"The new gondola lift is a logical and important step in the further development of our ski area. I am particularly pleased to see that the chosen path is being continued with responsibility, foresight, and courage. This investment project strengthens not only the company but the entire Sarntal valley."

— Albert Hochkofler, Former President of the Reinswald Mountain Lifts

Securing the Future of Sarntal Tourism

By replacing outmoded technology with a modernized, efficient gondola line, Reinswald aims to streamline peak-hour traffic, reduce wait times, and elevate the overall guest experience. The upgraded facility will ensure the Sarntal valley remains a competitive, high-quality destination within the South Tyrolean alpine network for decades to come.

https://www.reinswald.com/

Directory

Indy Pass Recco Leitner Zeal Tirol Halti ISPO Technoalpin