Lenzerheide Bergbahnen AG installs snowmaking in Valbella
In this story
Arosa Lenzerheide
Resort in Graubünden, Switzerland
- Village height
- 1,586 m
- Top lift
- 2,854 m
- Pistes
- 164 km
- Lifts
- 49
- Nearest airport
- Sankt Gallen Altenrhein Airport (ACH) · 1h 30m
The long-awaited snowmaking of the valley run to the Valbella ski lift is becoming a reality – just in time for the 2025/26 winter season.
The project to create a snow-covered slope to the valley station of the Valbella ski lift was launched over 15 years ago. Now, along with the renovation of the ski lift, it can finally be implemented, significantly enhancing this important access point to the ski area.
Get Arosa Lenzerheide news by email.
Follow Arosa LenzerheideThe Val Schamaela slope (No. 68b) is of great importance: It allows guests to return to Valbella and the parking lots, which was previously only possible with sufficient natural snow. It also reduces the risk of skiers being stranded at the valley station of the Cumascheals chairlift and having to walk to the Valbella ski lift in the event of wind-related disruptions.
The construction of the pipes and shafts presented several challenges. Jeannot Raschle, Head of Snowmaking and Infrastructure, said: "The complexity lay in finding a route that both took into account the protection of the moors and crossed land for which we obtained the consent of the owners." Obtaining the necessary approvals, in particular, took a considerable amount of time; in some cases, signatures even had to be arranged abroad.
With the groundbreaking ceremony on Monday, September 15, 2025, a long-awaited project becomes reality. Christian Wyrsch, interim CEO, said: "We are very pleased to finally be able to improve the connection here. The project has required a great deal of commitment from various CEOs and division heads. I would like to thank everyone involved for their determination and patience."
The renovation of the Valbella ski lift has already been completed. Curdin Meier, Head of Technology North: "We have updated the control and safety monitoring systems and implemented important improvements. In the middle of the route, we were able to mitigate a safety risk – especially for children – and reduce the need for snow. This allows the ski lift to open earlier." Othmar Kurath, Head of Lifts, adds with a grin: "With snowmaking, we also produce snow for the ski lift route. That's why we're only installing the brackets shortly before opening – without brackets, the cable can be cleared of ice more easily."
The planned renovation of the valley station had to be postponed due to costly requirements.
Lenzerheide Bergbahnen AG is investing CHF 1.3 million in Valbella, including CHF 0.9 million in snowmaking and CHF 0.4 million in ski lift renovations. Acting CEO Christian Wyrsch: "Given the climatic challenges and ensuring the safe reopening of the ski lift, this is a very important investment for us."