Independent voices. A mountain perspective. The winter edition26 / 27

Find your mountain story.

Snow News

Helmissimo project brings a faster gateway to Monte Elmo, 3 Zinnen

Helmissimo project brings a faster gateway to Monte Elmo, 3 Zinnen

In this story

A new 10-person gondola, a widened return run and a revamped base area are set to reshape the ski-day experience at Versciaco—while raising familiar questions about capacity, snowmaking and the future of Alpine winters.

At Versciaco, the route to Monte Elmo is being redesigned from the valley floor upward. For the 2026/27 winter season, 3 Zinnen Dolomites plans to replace its decades-old gondola with Helmissimo, a faster 10-person lift, while widening sections of the ski run back to the village and upgrading facilities at the Punka service centre. The package is intended to make access smoother for skiers arriving by car or train, and to improve the flow of people through one of the area’s main entrances.

The lift, built by Leitner, will replace the six-person installation opened in 1989. Its 97 panoramic cabins are designed to carry up to 3,250 people an hour, compared with 1,800 today. At a speed of 6.5 metres per second, the ride is expected to take 7 minutes and 49 seconds—down from just over 10 minutes. The route climbs 910.80 metres over a sloping length of 3,047.67 metres.

The gains are tangible for visitors: shorter waits at busy times and a quicker ascent. But the capacity increase also puts pressure on the rest of the mountain experience. More people arriving at the top means the trails and base facilities must handle larger flows, not just the lift. The project’s other elements appear designed with that in mind: the Helmissimo return run will be widened at several narrow points, and the Punka building will be expanded and reorganized.

At Punka, the plan includes a direct, covered connection between ski storage and rental facilities and the gondola, as well as easier routes from the parking area. Changing rooms and lockers allow visitors to arrive in ordinary shoes and put on ski gear at the base—an especially practical arrangement for families and people travelling by train. The redevelopment aims to make the transition from arrival to lift more straightforward, rather than treating the gondola as an isolated upgrade.

The widened piste is intended to create more room for skiers of different abilities, with a mix of easier stretches and more dynamic sections. Snowmaking infrastructure is also being upgraded. The resort says targeted snow production, guided by piste-groomer data and drone surveys, can help operators direct resources to areas that need them most and make use of suitable cold periods. That approach can improve operational planning, but it cannot remove the basic dependence on weather: snowmaking still requires favourable temperatures.

Helmissimo is the latest chapter in Monte Elmo’s lift history. The mountain’s first access lift opened in 1976; the 1989 gondola replaced that earlier two-seater system. The new project extends a long-running investment in access, but its significance now reaches beyond lift technology: it ties together transport, slope design, equipment services and snow management at a key entry point to the ski area.

For the 2026/27 season, the resort calendar is listed as running from November 28, 2026, to April 4, 2027, though dates for individual sectors remain subject to operating schedules and snow conditions. Helmissimo’s planned opening is part of that season.

The project’s promise is straightforward: spend less time queuing and getting organized, and more time on the mountain. Whether that promise holds will depend on how well the new lift, widened piste and expanded base area work together during peak periods—and on how reliably the resort can prepare the slopes in changing winter conditions.

Directory

Halti Indy Pass ISPO Leitner Recco Technoalpin Tirol Zeal Alpy.com Laughland Jones