Independent voices. A mountain perspective. The winter edition26 / 27

Find your mountain story.

Snow News

Fisser Bergbahnen: New Möseralm cable car 2028/29 - largest construction project in the company's history

Fisser Bergbahnen: New Möseralm cable car 2028/29 - largest construction project in the company's history

In this story

Over the next two years of construction, the existing Möseralm cable car will be replaced by a state-of-the-art, high-performance 10-person gondola lift with a transport capacity of up to 3,800 people in its final configuration and extended to the Fisser Joch.

A new central station is being built in Fiss, which will house the Möseralm cable car and Sonnenbahn cable car, as well as numerous service providers, all under one roof. A new intermediate station will be built where the Möseralm cable car's mountain station and the Möseralm restaurant are currently located. The new mountain station will be built at the Fisser Joch, directly opposite the Almbahn mountain station.

Facts & Figures

Number of cable car pylons:

  • Section 1 (Fiss valley station - Möseralm): 12 pylons;

  • Section 2 (Möseralm - Fisser Joch): 11 pylons

Journey time:

  • Section 1: 6.5 min

  • Section 2: 5.74 min

  • Number of cabins: 137 gondolas

  • Cabin capacity: 10-person gondolas

  • Manufacturer: Doppelmayr

  • Travel speed: up to 6.5 m/s

This will create a second direct access road to the north side of Fiss in time for the 2028/2029 winter season – and thus a comfortable connection to the most snow-sure area on the Fiss side.

Two new restaurants expand the culinary offerings

In addition to the new 10-person gondola lifts from cable car manufacturer Doppelmayr, guests can also look forward to new restaurants that will expand the culinary offerings on the mountain and take them to a new level:

Instead of the previous self-service restaurant, a new à la carte restaurant with table service is being built on the Möseralm.

In the new mountain station building, an exclusive fine-dining restaurant with an impressive 360-degree panoramic view will provide exceptional culinary experiences.

Fiss Central Station - Central point of contact for mountain railways, service and comfort

The new central station is being built on the current site of the valley stations of the Möseralmbahn and Sonnenbahn and will be a central starting point in the future.

But the modern station building offers much more than just access to the gondola lifts: the ski ticket office, a convenient ski depot, and numerous other services are now located here. This means the central station unites many important points of contact under one roof, ensuring even greater convenience and shorter distances.

Möseralm cable car middle station

Modern Á la carte restaurant

The new mid-station on the Möseralm will not only be an architectural highlight, but will also offer a great deal in terms of cuisine. A modern, stylishly furnished restaurant with table service will invite guests to enjoy themselves and linger.

Another advantage: The Möseralm cable car's mid-station will be directly integrated into the new building complex. This will allow guests to reach the restaurants directly from the gondola lift via short, comfortable, and barrier-free routes. Modern cable car comfort, architecture, and culinary delights will thus combine to create a unique mountain experience.

Möseralm cable car mountain station

Fine dining and 360° panoramas:

The new mountain station of the Möseralm cable car, with its elegant, modern design, will soon stand proudly at the highest point of the Fiss ski area. But it's not just its impressive architecture that makes the building a striking landmark. Guests can expect unique insights, culinary highlights, and breathtaking views across three levels.

Fascinating insights into cable car technology:

  • Generous panoramic windows offer exciting views of the underlying technology of the new gondola lift.

  • Culinary delights at the highest level – Fiss360°

  • An exclusive fine-dining restaurant invites you to experience special culinary moments while enjoying the impressive view of the surrounding mountains.

  • A 360-degree panorama of the highest order:

  • A spacious viewing platform is being built on the roof of the new mountain station building, offering a unique panoramic view of the fascinating Tyrolean mountains.

This makes the new mountain station far more than just a starting point for unforgettable days of skiing – it will itself become a special experience high up in the mountains.

A project in two construction phases

Step by step towards completion by winter 2028/2029

A construction project of this scale requires not only careful planning but also precise coordination of the individual construction phases. To ensure everything is ready for the start of the 2028/2029 winter season, the construction work will be divided into two major phases.

Phase 1 – Spring to Autumn 2027

The winter season in Serfaus-Fiss-Ladis ends on April 4, 2027. Just one day later, on April 5, 2027, the official starting signal will be given for the extensive construction work.

In the first year of construction, work is proceeding literally from top to bottom. The first step is the new mountain station of the Möseralm cable car at the Fisser Joch, which is being built directly next to the existing mountain station of the Alm cable car.

Meanwhile, construction is also in full swing at the Möseralm. A completely new building complex is being built there, which will house both the Möseralm cable car's mid-station and new restaurants. To accommodate this, the current location of the mid-station is being relocated: where the Möseralm restaurant is currently situated, the new mid-station and restaurants will be united under one roof. The existing 6-person Möseralm cable car will continue to operate until the end of the 2027/28 winter season.

Phase 2 of construction – Spring to Autumn 2028

With the start of the second construction phase, further extensive changes are on the horizon. First, the existing Möseralm cable car will be dismantled. The current shared valley station building for the Möseralm and Sonnenbahn cable cars will also be replaced by a modern new building.

The new Fiss central station is being built on the same site, where both gondola lifts will continue to be united under one roof.

Simultaneously, the new Möseralm cable car line is being built. At the same time, construction work on the mountain station at the Fisser Joch and the intermediate station on the Möseralm is entering its final phase.

The ultimate goal: The 2028/2029 winter season!

After two intensive years of construction, the time should finally come: Just in time for the start of the 2028/2029 winter season, the new gondola lifts and restaurants should begin operation and offer guests a completely new mountain experience.

Directory

Halti Indy Pass ISPO Leitner Recco Technoalpin Tirol Zeal Alpy.com Laughland Jones